Contact Us
Whatsapp:
+86-15532763985
E-mail:
bit1@uqier.com
Address:
Peacock City University, Langfang Development Zone, Hebei Province, China
FYL200
After several years' development,over 95% of our products are exported to the overseas market, such as Europe. America and Southeast Asia.
- Commodity name: FYL200
Email:
bit1@uqier.com
- Description
-
Product Parameter
Parameter Specification Weight (T) 4.7 Drill pipe diameter (mm) Φ76 Φ89 The hole diameter (mm) 140 - 254 Drill pipe length (m) 1.5m 2.0m 3.0m Drill depth (m) 200 Rig lifting force (T) 13 One - time advance length (m) 3.3 Rapid rise speed (m/min) 20 Walking speed (km/h) 20 - 40 Fast feeding speed (m/min) 40 Gradeability (Max.) 30 Width of loading (m) / Equipped capacitor (kw) 65 Swing torque (N.m) 3400 - 4700 Working air pressure (MPA) 1.7 - 2.5 Dimensions (mm) 435016002450 Air consumption (m³/min) 17 - 31 The penetration efficiency (m/h) 10 - 35 Swing speed (rpm) 45 - 65 The engine brand quanchai
Key words:
Roller bit | Drag bit | Hole opener
LANGFANG UQIER DRlLL BIT CO.,LTD
Optimum material, layer check production, focus on the production of all kinds of good quality drill bit.
Quality assurance of raw materials in large factories
Strength merchants have rich inventory
Customized processing of drawings and samples
Seiko and strict quality inspection
Integrity management intentions production
Fast proofing and fast delivery
Walk into the factory-feel the quality
We are equipped with a variety of production machines, do drill bit we are professional.
Concern to Buyers
To answer your doubts, I know all about your relationship.
We will send you the product picture, can you quote me?
Yes, if you need to quote an approximate price for you, you can calculate the cost.
Company Delivery Time
Establish a strict supplier evaluation system, give priority to suppliers with good reputation and timely delivery; at the same time, sign clear delivery agreements with suppliers and set reasonable breach terms.
What is the quality of raw materials?
Strengthen the incoming inspection of raw materials to ensure that each batch of raw materials meets the quality standards; regularly conduct quality audits of suppliers to ensure the effective operation of the supplier's production process and quality management system.
How about inventory?
Adopt advanced inventory management system to realize real-time monitoring and early warning of inventory, optimize inventory structure, reduce unnecessary inventory backlog, and conduct regular inventory inventory to ensure that the accounts match.
Get A Quote
Note: Please leave your email address, our professionals will contact you as soon as possible!